36,800
edits
Line 117: | Line 117: | ||
Repeat HGS Foundational Steps Connect to Inner Core and the Prepare for Session Calibration Protocol (Steps 1-4) until Body is Stabilized (with a YES response) to Complete Calibration Protocol. | Repeat HGS Foundational Steps Connect to Inner Core and the Prepare for Session Calibration Protocol (Steps 1-4) until Body is Stabilized (with a YES response) to Complete Calibration Protocol. | ||
Seven Day Sleep State PMR- Instruction on Page 137-139 | |||
Instruction on Page 137-139 | |||
==References== | ==References== |